Caleigh's Pool - Week Three

"Caleigh's Pool"Holly D Gray1 Comment
Week three has been slower than the first two mainly due to freezing temperatures. The deck couldn't be laid with the chance of freezing. With the week Caleigh had, it's probably better that it worked out the way it did though. If the weather cooperates we don't have much longer until it is finished. Enjoy the week in photos.

Day 10 - Gas Plumbing Covered 12-5-11
GasPlumbingCover
12-6-11 through 12-8-11 Inclement Weather
Rain and freezing night time temperatures.
FreezingWeather

FreezingWeather2
Day 11 - Deck Poured and Salted 12-9-11
The salt is sprinkled on top of the cement to add a texture to the final product.
Deck3

Deck2

Deck1

Deck

HandPrint3 HandPrint2

HandPrint